San Joaquin Regional Rail Commission Phase 1 Improvements for the Robert J. Cabral Station and Vicinity
2 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008022126
- Lead Agency
- San Joaquin Regional Rail Commission
- Document Title
- San Joaquin Regional Rail Commission Phase 1 Improvements for the Robert J. Cabral Station and Vicinity
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 8/19/2008
- Present Land Use
- Zoning: IL (Industrial, Limited) and LG (Industrial, General) General Plan: Industrial
- Document Description
- Project development at Site A is realignment/reconstruction of access to existing transit station, reconstruction and addition of new parking facilities, and construction of new open space, architectural and security features. Project (Site B) also proposes rehabilitation of historic station building and construction of additional passenger services, circulation, and parking facilities.
- Contact Information
-
Thomas Reeves
San Joaquin Regional Rail Commission
Lead/Public Agency
949 E. Channel Street
Stockton, CA 95202
Phone : (209) 944-6242
Location
- Coordinates
- 37°57'26.50"N 121°16'46.70"W
- Cities
- Stockton
- Counties
- San Joaquin
- Cross Streets
- Miner Avenue and Aurora Street
- Zip
- 95202
- Total Acres
- 2.4 (A), 1.8 (B)
- Parcel #
- 151-140-04, 14, 15; 151-150-08; 151-201-02, 03, 06
- State Highways
- SR 4
- Railways
- UPRR system
- Schools
- Jane Frederick Continuation High School
- Waterways
- Stockton Deepwater Channel
- Township
- 1N
- Range
- 6E
- Base
- MDB&M
Notice of Determination
- Approving Agency
- San Joaquin Regional Rail Commission
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- SJRRC 949 East Channel Street Stockton, CA 95202
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.