Redevelopment Area Drainage Project

2 Documents in Project

Summary

SCH Number
2008022106
Lead Agency
City of Folsom
Document Title
Redevelopment Area Drainage Project
Document Type
NOD - Notice of Determination
Received
Posted
4/11/2008
Present Land Use
City of Folsom, Public Works Department Rights-of-Way
Document Description
The City of Folsom is proposing to upgrade existing stormwater/drainage infrastructure through implementation of the Redevelopment Area Drainage Project. The City is responsible for the management of stormwater, which includes the design, construction, operation, and maintenance of storm drain systems and the prevention of pollutants associated with urban runoff. The proposed project would focus on Flooding Problem Area 1, defined in the Redevelopment Area Drainage Improvements Master Plan as Sibley Street, Natoma Street, and East Bidwell area. The improvements would include upsizing of existing drainage pipes with the addition of pipelines and drainage swales, while maintaining the historical feel of the project area.

Contact Information

Name
Sarah Staley
Agency Name
City of Folsom Public Works Department
Contact Types
Lead/Public Agency

Location

Cities
Folsom
Counties
Sacramento
Cross Streets
Natoma Street and Bidwell Street
Zip
95630
Total Acres
~ 3.0
State Highways
Highway 50
Railways
Regional Transit Lightrail
Schools
Little Folks University
Waterways
Folsom Lake
Township
10N
Range
7E
Section
10
Base
MDB&M

Notice of Determination

Approving Agency
Folsom City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.