Use Permit 07-17 and Architectural Review 07-14 (Irwin Pancake)

2 Documents in Project

Summary

SCH Number
2008022079
Lead Agency
City of Chico
Document Title
Use Permit 07-17 and Architectural Review 07-14 (Irwin Pancake)
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2008
Present Land Use
Site is currently vacant. Zoning: R3 (Medium-High Density Residential) General Plan: Medium High Density Residential
Document Description
The project proposal seeks to construct a 77-unit senior assisted living facility on a 1.89 acre site. The proposed three-story building is 79,905 s.f. in size, and is a maximum of 45 feet in height. The project is effectively an extension of the Sierra Sunrise Village senior complex located to the south of the project site on the south side of a tributary of Dead Horse Slough, borrowing general design and architectural features from existing development. Vehicle access is provided via three driveways, two taking access from Amanecida Common and one taking access from Sierra Sunrise Terrace. A total of 39 parking spaces are provided, half of which are covered with carports; a porte cochere is provided for passenger loading/unloading. Landscaped berms are located adjacent to both street frontages. No new storm outfalls or other modifications which would affect the slough tributary are proposed. Other appurtenant site elements (lighting, trash enclosure, emergency access drives, landscaped path along the slough, covered outside seating area, bicycle parking area) are provided to serve the development.

Contact Information

Name
Greg Redeker
Agency Name
City of Chico
Contact Types
Lead/Public Agency

Location

Cities
Chico
Counties
Butte
Cross Streets
SW corner of Amanecida Common and Sierra Sunrise Terrace
Zip
95928
Total Acres
1.89
Parcel #
018-360-003
State Highways
32, 99
Schools
Marsh JH and Little Chico ES
Waterways
Dead Horse Slough, Little Chico Creek, Big Chico Creek
Township
22N
Range
2E
Section
20
Base
MDB&M

Notice of Determination

Approving Agency
City of Chico Redevelopment
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.