Modified Crystal Springs San Andreas Transmission Upgrade Project
11 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008022054
- Lead Agency
- San Francisco, City and County of (City and County of San Francisco)
- Document Title
- Modified Crystal Springs San Andreas Transmission Upgrade Project
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 9/7/2010
- Document Description
- Seismic and functional upgrades to the Upper Crystal Springs Dam Culverts, including seismic strengthening of the Lower Culvert, which crosses the San Andreas Fault rupture zones. Seismic improvements to the Crystal Springs Outlet Structures 1 and 2, including removal of the seismically vulnerable aboveground portions of the towers, and construction of a small onshore control shed for remote valve operation. Major seismic upgrade of the Crystal Springs Pump Station (CS Pump Station), including construction of a new, seismically strengthened Pump Station, and replacement of all related facilities, pipelines, and pipeline connections. The upgrade would also include increasing the pump station booster capability to 120 million gallons per day to meet delivery reliability goals, and construction of a new dissipation structure for releases into San Mateo Creek to meet anticipated DSOD requirements. Seismic upgrades to the existing CS/SA Pipeline that conveys water from CS Pump Station to San Andreas Reservoir (~4.7 miles), including replacement of 2 segments of the pipeline, general pipeline improvements (i.e., corrosion protection, replacement of valves, etc.), and new access roads to ensure access to the pipeline for emergency and maintenance repairs. Seismic upgrade to the San Andreas Outlet Structures 2 and 3, including improvements at both the outlet towers and tunnel portals located at the Harry Tracy Water Treatment Plant. Implementation of habitat mitigation sites including, but not limited to, full implementation of the San Andreas and Adobe Gulch habitat improvements sites.
- Contact Information
-
Timothy Johnson
City and County of San Francisco Planning Department
Major Environmental Analysis 1650 Mission Street, Suite 400
San Francisco, CA 94103
Phone : (415) 575-9035
Location
- Coordinates
- 37°33'10"N 122°23'9"W
- Cities
- Burlingame Hillsborough Millbrae
- Counties
- San Mateo
- Cross Streets
- Skyline Blvd, I-280
- Total Acres
- 135
- Parcel #
- 093070998, 093070071, 093070072...
- State Highways
- 280, 92
- Schools
- Meadows ES, Odyssey
- Waterways
- San Mateo Creek
- Base
- SanMateo
Notice of Determination
- Approving Agency
- San Francisco Public Utilities Commission
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- Planning Information Center 1660 Mission St, 1st Floor San Francisco, CA 94103
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.