Meridian Farms Fish Screen Project

3 Documents in Project

Summary

SCH Number
2008022042
Lead Agency
Fish & Game #2
Document Title
Meridian Farms Fish Screen Project
Document Type
NOD - Notice of Determination
Received
Posted
3/28/2008
Present Land Use
Agricultural
Document Description
MFWC is proposing a two phased program to consolidate three existing surface water diversions into two diversions along the Sacramento River in the vicinity of the Town of Grimes and Meridian, Sutter County. The two new water diversions would be equipped with positive barrier fish screens to prevent entrainment of migrating, at-risk, native fish species. Due to the consolidation, the proposed project also includes phased conveyance system improvements to accommodate water delivery to two diversions instead of three. The proposed project will not increase MFWC's overall diversion capacity from the Sacramento River. Once the new diversions are completed at Meridian and Grimes site locations, the existing diversions at Meridian, Drexler, and Grimes will be removed during their respective phases and in compliance with Reclamation Board, California Department of Fish and Game, National Marine Fisheries Service, and the U.S. Fish and Wildlife Service requirements.

Contact Information

Name
Tracy McReynolds
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Counties
Sutter
Cross Streets
Highway 20 and South Meridian Road
Zip
95957
Total Acres
9,150
Parcel #
Various
State Highways
20
Waterways
Sacramento River
Other Location Info
City/Nearest Community: Meridian California
Other Information
Latitude/Longitude: 39° 8' 35.9"N / 121° 54' 47.9"W

Notice of Determination

Approving Agency
California Department of Fish and Game
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print