International Drive Extension Kilgore to Sunrise Project

2 Documents in Project

Summary

SCH Number
2008022009
Lead Agency
City of Rancho Cordova
Document Title
International Drive Extension Kilgore to Sunrise Project
Document Type
NOD - Notice of Determination
Received
Posted
4/25/2008
Present Land Use
The proposed project area is located on International Drive, which runs in an east/west direction perpendicular to Kilgore Road where it terminates. The City of Rancho Cordova General Plan Land Use indicates the presence of Low Density Residential, Medium Density Residential and Office/Mixed Use Land uses within the project area, as well as Public/Quasi-Public along Folsom South Canal and Special Planning Area east of Sunrise Boulevard. No agricultural land uses are located within the project area.
Document Description
The project will extend International Drive from its current terminus at Kilgore Road to approximately 1,500 linear feet to the Sunrise Boulevard/Monier Circle (north) signalized intersection. The project would include an approximately 112 linear foot six-lane bridge over the Folsom South Canal and re-striping between Prospect Park Drive and Kilgore Road to include a six-lane roadway, with minor widening at the Kilgore Road approaches and at the Monier Circle (south) intersection would be reconfigured to eliminate left turns onto Sunrise Blvd.

Contact Information

Name
Melissa D. Logue
Agency Name
City of Rancho Cordova
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Cross Streets
International Drive between Kilgore and Sunrise Boulevard
Total Acres
3.0
State Highways
US-50
Airports
Mather Airport
Waterways
Folsom South Canal
Other Location Info
City/Nearest Community: Rancho Cordova

Notice of Determination

Approving Agency
City of Rancho Cordova City Council
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.