International Drive Extension Kilgore to Sunrise Project
2 Documents in Project
Summary
SCH Number
2008022009
Lead Agency
City of Rancho Cordova
Document Title
International Drive Extension Kilgore to Sunrise Project
Document Type
JD - Joint Document
Received
Present Land Use
The proposed project area is located on International Drive, which runs in an east/west direction perpendicular to Kilgore Road where it terminates. The City of Rancho Cordova General Plan Land Use indicates the presence of Low Density Residential, Medium Density Residential and Office/Mixed Use Land uses within the project area, as well as Public/Quasi-Public along Folsom South Canal and Special Planning Area east of Sunrise Boulevard. No agricultural land uses are located within the project area.
Document Description
The proposed project would extend International Drive eastward from its existing terminus at Kilgore Road by approximately 1,500 linear feet to the Sunrise Boulevard/Monier Circle (north) intersection, including an approximately 112 linear foot six-lane bridge with left and right turn pockets over the Folsom South Canal. The existing four-lane International Drive would be re-striped to include six (6) through-lanes from Prospect Park Drive to the intersection of Kilgore Road approximately 1,300 linear feet with minor widening at the Kilgore Road intersection to accommodate turn pockets. Monier Circle would be widened at the intersection approaches, as needed, to align with International Drive and the existing median on Sunrise Boulevard at the Monier Circle (south) intersection would be reconfigured to eliminate left turns onto Sunrise Boulevard.
Construction on Sunrise Boulevard would include approximately 5,200 linear feet of re-striping to six lanes (from Fitzgerald Drive to White Rock Road) necessary for intersection accommodation. West of Sunrise Boulevard, along the Folsom South Canal frontage, the project would widen the pavement and install curb, gutter and sidewalk. A parking lot on the north side of International Drive could be modified to accommodate project construction. South of International Drive, a soundwall for an adjacent residential subdivision could be modified to provide noise mitigation, and "noise reducing' pavement would be used along the new International Drive roadway segment to further reduce noise.
The Bureau of Reclamation maintenance road for the Folsom South Canal would be modified to go under International Drive or connect at-grade to Sunrise Boulevard (yet to be determined), and the bicycle path between Sunrise Boulevard and the maintenance road would be modified to connect to International Drive and also go under the bridge. Additionally, the existing approach roadway, utilities, curbs, landscaping, street lighting, drainage systems, and traffic striping would be modified as necessary to accommodate the extended roadway and new bridge. The project is located within the City of Rancho Cordova.
Contact Information
Name
Melissa D. Logue
Agency Name
City of Rancho Cordova
Contact Types
Lead/Public Agency
Phone
Location
Counties
Sacramento
Cross Streets
International Drive between Kilgore and Sunrise Boulevard
Total Acres
3.0
State Highways
US-50
Airports
Mather Airport
Waterways
Folsom South Canal
Other Location Info
City/Nearest Community: Rancho Cordova
Notice of Completion
State Review Period Start
State Review Period End
State Reviewing Agencies
Air Resources Board, Transportation Projects, California Department of Conservation (DOC), California Department of Fish and Wildlife, North Central Region 2 (CDFW), California Department of Parks and Recreation, California Department of Transportation, District 3 (DOT), California Highway Patrol, California Native American Heritage Commission (NAHC), California Regional Water Quality Control Board, Central Valley Sacramento Region 5 (RWQCB), Caltrans, Division of Aeronautics, Central Valley Flood Protection Board, Department of Water Resources, Office of Historic Preservation, Resources Agency
Development Types
Transportation:Local Road (Roadway Extension and New Bridge)
Local Actions
Roadway Extension and New Bridge
Project Issues
Aesthetics, Agriculture and Forestry Resources, Air Quality, Cultural Resources, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Mineral Resources, Noise, Population/Housing, Public Services, Recreation, Solid Waste, Transportation, Vegetation, Wetland/Riparian, Wildlife
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.