Public Safety Enterprise Communications (PSEC) Project

11 Documents in Project

Summary

SCH Number
2008021126
Lead Agency
United States Army, Army Corps of Engineers (USACE)
Document Title
Public Safety Enterprise Communications (PSEC) Project
Document Type
NOD - Notice of Determination
Received
Posted
9/3/2008
Present Land Use
Multiple existing land uses. Of 52 proposed communication facility locations, 25 are located adjacent to existing telecommunication facilities. The remaining 27 locations are in areas where there are not adjacent telecommunications facilities. Of these 27, seven are proposed in areas that have not been previously disturbed.
Document Description
The project entails the upgrading of the County of Riverside's emergency services communication network. This network will serve fire and law enforcement personnel and will allow expanded interoperability with other agencies and jurisdictions. Approximately 52 telecommunications facilities will be constructed throughout Riverside County and in several locations in San Bernardino County and one location in San Diego County. The typical facility will be composed of a communication tower and equipment shelter, all located within a 65 x 65 foot fenced compound.

Contact Information

Name
Claudia Steiding
Agency Name
Riverside County Department of Facilities Management
Contact Types
Lead/Public Agency

Location

Counties
Riverside, San Bernardino, San Diego
Cross Streets
Multiple locations
Parcel #
Multiple
State Highways
Multiple
Waterways
Multiple

Notice of Determination

Approving Agency
County of Riverside
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print