AMWC Recharge Ponds PLN 2007-1257
3 Documents in Project
Summary
SCH Number
2008021108
Lead Agency
City of Atascadero
Document Title
AMWC Recharge Ponds PLN 2007-1257
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2009
Document Description
THe DFG is executing a Lake and Streambed Alteration Agreement pursuant to Section 1603 of the Fish and Game Code to the Project applicant, Mr. Ken Gray. The proposed Project would consist of excavation a 250 ft by 440 ft area to an average depth of ~5 ft to construct a recharge pond, distribute excavated material around the pond margin to form an elevated berm, construct access driveways ranging between 75 and 175 ft in length with an average width of 12 ft, and installing a six-foot tall chain link fence with a buffer of native vegetation to minimize visual impacts.
The proposed project consists of two phases. The first phase will include the construction of one water recharge pond requiring 22,000 cubic yards of cut. The second phase will be constructed only if necessary, and will include the construction of two additional water recharge ponds requiring a total of 32,850 cubic yards of cut. The project proposes a total of 54,850 cubic yards of cut. The excavated fill dirt is proposed to be used to create a building pad on the same parcel for upgrades to Well #4. Excess dirt will be stock piled at the Atascadero Mutual Water Company's property on Sycamore Road.
Contact Information
Name
Mike Hill
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Atascadero
Counties
San Luis Obispo
Cross Streets
Villa Del Sueno/River parcel
Zip
93422
Total Acres
~ 5
Parcel #
049-011-003
Waterways
Salinas River
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes