Valley Region Span K-8 No. 1 School

3 Documents in Project

Summary

SCH Number
2008021008
Lead Agency
Los Angeles Unified School District
Document Title
Valley Region Span K-8 No. 1 School
Document Type
NOD - Notice of Determination
Received
Posted
9/12/2008
Present Land Use
Residential Zoning: RA-1-K (Suburban, equine keeping permitted) General Plan: Residential Low Density
Document Description
The proposed project involves construction of approximately 90,000 square feet of building space to accommodate approximately 1,047 students in grades kindergarten through eight, and approximately 85 full- and part-time faculty and staff. The proposed project would include 41 classrooms in two buildings, and includes a multipurpose building with a large multipurpose room, library/media center, food service area, maintenance and administration offices; a lunch shelter; a gymnasium; and hard courts, playgrounds, and play fields. No nighttime field lighting would be provided; however, nighttime security lighting would be provided. Approximately 93 parking spaces would be provided for faculty and staff on a surface level parking lot, located adjacent to the northern boundary of the campus. Access to the parking lot would be from Bledsoe Street.

Contact Information

Name
John Moreno
Agency Name
Los Angeles Unified School District
Contact Types
Lead/Public Agency

Location

Counties
Los Angeles
Cross Streets
Dronfield Avenue and Bledsoe Street
Zip
91342
Total Acres
6.4
Parcel #
2504-005-001 through 2504-005-008
State Highways
I-210, I-5
Railways
Union Pacific
Schools
7 Elementary, 1 Middle, 1 High, 5 Private/Other, 1 Postsec
Waterways
Drainage Channels: Wilson Canyon and Sombrero Canyon
Township
3N
Range
15W
Other Location Info
City/Nearest Community: Sylmar

Notice of Determination

Approving Agency
Los Angeles Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print