Lease Agreement For Subsurface Utility Trenches And Air Rights For Pedestrian Bridges

9 Documents in Project

Summary

SCH Number
2008012075
Lead Agency
University of California, San Francisco
Document Title
Lease Agreement For Subsurface Utility Trenches And Air Rights For Pedestrian Bridges
Document Type
NOD - Notice of Determination
Received
Posted
6/12/2012
Present Land Use
The project site is on land that is part of the Mission Bay South Plan of Mission Bay Redevelopment Area, and is presently zoned for Mission Bay commercial, industrial (including research and development) and retail (MB C-I). The project is consistent with current zoning. The site is controlled by the UC and is part of the UCSF Medical Center at Mission Bay, a project that has been approved by the UC Regents.
Document Description
Lease between The Regents of the University of California, as Lessee, and the City and County of San Francisco (City), as Lessor, for two underground utility trenches and air rights for two pedestrian bridges located under and over Fourth Street, south of 16th Street and north of Mariposa Street, San Francisco, California, for use by the UCSF Medical Center at Mission Bay. Lease is required for hospital operations (utility connections beneath Fourth Street) and impatient movement between hospitals (pedestrian bridges above Fourth Street).

Contact Information

Name
Diane Wong
Agency Name
University of California Physical & Environmental Planning
Contact Types
Lead/Public Agency

Location

Cities
San Francisco
Counties
San Francisco
Cross Streets
Third Street, 16th Street & Owens Street
Zip
94158
Total Acres
~ 14.5
State Highways
US 101, I-80, I-280
Railways
Caltrain
Airports
No
Schools
Several
Waterways
San Francisco Bay, Mission Creek, Islais Creek

Notice of Determination

Approving Agency
University of California
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print