Martinez Marina Waterside Improvements

5 Documents in Project

Summary

SCH Number
2008012065
Lead Agency
City of Martinez
Document Title
Martinez Marina Waterside Improvements
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2012
Document Description
This proposed project involves hydraulic dredging a small portion of the Martinez Marina to depths ranging from approximately -6 feet to -8 mean lower low water (MLLW), with an additional 2 feet over dredge allowance. The estimated maximum volume of dredge material is 24,100 cubic yards over a surface area of approximately 2.84 acres. Sediment would be removed with a cutterhead hydraulic suction dredge and conveyed via an 8- to 12-inch diameter pipe to the City of Martinez upland disposal ponds located southeast of the marina. The Project would result in permanent impacts to 0.08 acres of delta smelt (Hypomesus transpacifficus) habitat. The project is expected to result in incidental take of delta smelt and longfin smelt (Spirinchus thaleichthys), which are designated as an endangered and threatened species, respectively, under the California Endangered Species Act. The ITP referenced above as issued by DFG authorizes incidental take of species listed under CESA that may occur as a result of Project implementation.

Contact Information

Name
Crystal Spurr
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Martinez
Counties
Contra Costa
Zip
94553
Total Acres
70
Parcel #
373-040-003
Waterways
Southern shore of Suisun Bay where it joins with the Carquinez Strait

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No