Novy Pump (Lake or Streambed Alteration Agreement No. 1600-2015-0517-R1)

5 Documents in Project

Summary

SCH Number
2008012062
Lead Agency
Fish & Wildlife 1 (Redding) (California Department of Fish and Wildlife, Region 1)
Document Title
Novy Pump (Lake or Streambed Alteration Agreement No. 1600-2015-0517-R1)
Document Type
NOD - Notice of Determination
Received

Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2015-0517-R1, pursuant to section 1602 of the Fish and Game Code to the project Applicant, Lowell L. Novy. The project is limited to two components associated with the Novy pump diversion (Novy Pump): (1) the diversion of water from Shasta River for irrigation and stock water; and (2) operation and management of diversion intake and fish screen including removal sediments. The Novy Pump diverts up to 5.5 cubic feet per second (cfs) and operates on average 31 days per month from March to Nov. Approx. 465 acres are irrigated with this diversion, solely on Permittee's property. Throughout the year water is pumped from the Novy Pump with a one horsepower submersible pump used to fill two 600 gallon stock water troughs. The Novy Pump was installed in approx. 2009 and was funded by the 2008 Klamath River Restoration Grant Program. Maintenance of the diversion intake and fish screen involves the periodic removal of silt around the fish screen using hand tools including shovels, small pumps to displace or remove silt, or a small excavator located above the stream banks.

Contact Information
Brad Henderson
CDFW
601 Locust Street
Redding, CA 96001

530-225-2362

Location

Counties
Siskiyou
Other Location Info
City/Nearest Community: various

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On
Final EIR Available Location
601 Locust Street, Redding, CA 96001

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
No