Lower Sunrise Restroom Replacement

2 Documents in Project

Summary

SCH Number
2008012013
Lead Agency
Sacramento County
Document Title
Lower Sunrise Restroom Replacement
Document Type
NOD - Notice of Determination
Received
Posted
6/14/2010
Present Land Use
Recreational / O / American River Parkway Plan
Document Description
The proposed project will provide updated restroom facilities for Parkway users. The project will: - Demolish and replace the existing restroom and drinking fountain with a new pre-fabricated restroom structure (drinking fountain included with the new restroom). - Reconnect the new restroom to the existing septic system. - Abandon the existing water line and install a new 2-inch water line from the north of the new restroom, connecting the restroom to existing water supply lines located to the northwest. - Install a new solar system power pole southeast of the restroom (south side of the bike trail) and install 2-inch electrical lines connecting the restroom to the new solar power pole. - Resurface the existing paved area. A certified arborist will be onsite for any pruning and to ensure tree protective measures are adhered to.

Contact Information

Name
Joyce Horizumi
Agency Name
Sacramento County
Contact Types
Lead/Public Agency

Location

Counties
Sacramento
Total Acres
0.5
Parcel #
056-0023-013
Waterways
American River
Township
9N
Range
6E
Base
MDB&M
Other Location Info
City/Nearest Community: Rancho Cordova

Notice of Determination

Approving Agency
County of Sacramento
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print