Pierce Street Transmission Main Project

2 Documents in Project

Summary

SCH Number
2008011119
Lead Agency
Coachella Valley Water District (CVWD)
Document Title
Pierce Street Transmission Main Project
Document Type
NOD - Notice of Determination
Received
Posted
3/27/2008
Present Land Use
Agricultural General Plan: Agricultural
Document Description
The Pierce Street Transmission Main Project proposes the installation of an 18-inch diameter domestic water pipeline for a length of 2 miles along Pierce Street between Airport Boulevard and Avenue 60 that will connect to the existing Well 6806 well site located in the southwest corner of Avenue 60 and Pierce Street. The pipeline alignment is within Riverside County rights-of-way along Pierce Avenue, Airport Boulevard, and Avenue 60. The purpose of the project is to allow the Coachella Valley Water District (CVWD) the flexibility to serve the Mecca area and communities south/southeast of Mecca (i.e, North Shore) with water from either the Mecca or Thermal Pressure Zone. In addition, the pipeline may also allow for service to these areas from a potential, future surface water treatment plant.

Contact Information

Name
Luke Stowe
Agency Name
Coachella Valley Water District
Contact Types
Lead/Public Agency

Location

Counties
Riverside
Cross Streets
Airport Boulevard and Pierce Street
Zip
92274
Total Acres
1.0
Parcel #
Various
State Highways
SR 86, SR 111
Railways
UPRR
Airports
Thermal Airport
Waterways
Coachella Valley Stormwater Channel, Coachella Canal
Township
6S
Range
8E
Section
23, 26
Base
SBB&M
Other Location Info
City/Nearest Community: Thermal

Notice of Determination

Approving Agency
Board of Directors of the Coachella Valley Water District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print