Lilac Del Cielo
5 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2008011070
- Lead Agency
- San Diego County
- Document Title
- Lilac Del Cielo
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 1/16/2015
- Present Land Use
- The site is currently vacant with a split zoning designation, RR.5 Rural Residential and RV8 (Variable-Family) Use Regulation and a split General Plan designation (17) Estate Residential and (7) Residential General Plan Designation.
- Document Description
- The proposed project is situated on a 54.82 acre property, from which 10.99 acres will be developed into 76 residential condomonium units. The development includes a storm water detention basin, brow ditches, utilities, roads, infrastructure, buildings, landscaping, and fuel management zones (FMZs). The remaining 43.83 acre undeveloped area includes FMZs, a trail easement, conservation area, and the existing developed West Lilac Road right-of-way (3.60 acres).
- Contact Information
-
Alan Monji
RWQCB - San Diego Region
2375 Northside Drive
San Diego, CA 92108
Phone : (619) 521-3968
Location
- Counties
- San Diego
- Cross Streets
- West Lilac Road and Camino del Cielo
- Total Acres
- 55.9
- Parcel #
- 126-060-77 and 126-430-01
- State Highways
- 76
- Waterways
- San Luis Rey River
- Township
- 10S
- Range
- 3W
- Section
- 20
- Base
- SBB&M
- Other Location Info
- City/Community: Unincorporated area, Bonsall
Notice of Determination
- Approving Agency
- RWQCB - San Diego Region
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- http://www.waterboards.ca.gov/rwqcb9/water_issues/programs/401_certification
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.