US-Route 395 Widening to Install Rumble Strips on Median and Outside Shoulders (CA Endangered Species Act Incidental Take Permit No. 2081-2011-008-06 (ITP))
6 Documents in Project
Summary
SCH Number
2008011063
Lead Agency
California Department of Transportation, District 8
Document Title
US-Route 395 Widening to Install Rumble Strips on Median and Outside Shoulders (CA Endangered Species Act Incidental Take Permit No. 2081-2011-008-06 (ITP))
Document Type
NOD - Notice of Determination
Received
Posted
7/5/2011
Present Land Use
Highway and Open Space/ Resource Conservation, Rural Living, Commercial, Airport Development District, Manufacturing/Industrial, and Desert Living
Document Description
This proposed project involves the construction of a 3.9 foot median with a median rumble strip, construction of 7.9 foot standard shoulders with shoulder rumble strips in each direction along U.S. Route 395 (US Route 395) for ~16.5 miles, from 7.85 miles north of State Highway 18 and 10.86 miles south of State Route 58 (SR58) from post mile (PM) 19.05 to PM 35.6, San Bernardino County.
Contact Information
Name
Kimberly Nicol
Agency Name
DFG
Contact Types
Lead/Public Agency
Phone
Location
Cities
Adelanto
Counties
San Bernardino
Cross Streets
United States Route 395 (US-395) between post mile 19.05 to post mile 35.6
Zip
92301
Parcel #
Various
Airports
Sun Hill Ranch and SCIA
Schools
Adelanto Christian School
Waterways
Mojave River
Notice of Determination
Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.