Target Store Redevelopment Project

3 Documents in Project

Summary

SCH Number
2008011046
Lead Agency
Azusa Redevelopment Agency
Document Title
Target Store Redevelopment Project
Document Type
NOD - Notice of Determination
Received
Posted
8/8/2008
Present Land Use
Commercial Zoning: Downtown Transit Village (DTV); General Plan: Downtown/Civic District - Transit Center
Document Description
The proposed project would develop an approximately 168,000-square-foot Target retail store, including 420 parking spaces. The proposed project would reach two stories in height. The Target sign tower, located above the main store entrance, would reach approximately 69 feet in height. Parking spaces and a receiving and loading dock would be located at-grade beneath the main sales and storage floor located on the second level. Additional angled parking spaces would be provided by the City and located adjacent to the project site, along San Gabriel Avenue. Vehicles would access the at-grade parking area from 9th Street, Azusa Avenue, and San Gabriel Avenue. Trucks would access the receiving and loading dock by entering on San Gabriel Avenue and exiting on Azusa Avenue. Several mature Coast Live Oak trees located on the east side of San Gabriel Avenue would be protected in place or removed and replaced per City ordinance. The proposed project would require an overlay zone, which would allow for additional building height, reduced parking stall size, and building articulation. Approximately 47,646 square feet of existing commercial and industrial buildings on the project site would be demolished with the construction of the proposed project.

Contact Information

Name
Suan Cole
Agency Name
City of Azusa Redevelopment Agency
Contact Types
Lead/Public Agency

Location

Cities
Azusa
Counties
Los Angeles
Cross Streets
9th Street and San Gabriel Avenue, 9th Street, Azusa Avenue
Zip
91702
Total Acres
4.10
Parcel #
8608-024-903
State Highways
210, 39, 66
Railways
Metro Gold Line, Union Pacific
Schools
Longfellow and Dalton ES, St. Francis
Waterways
Dalton Wash, San Gabriel River, San Dimas Wash

Notice of Determination

Approving Agency
City of Azusa
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print