Vista Towers: Sunshine Summit; P06-093, ER: 06-04-002
2 Documents in Project
Summary
SCH Number
2008011030
Lead Agency
San Diego County
Document Title
Vista Towers: Sunshine Summit; P06-093, ER: 06-04-002
Document Type
NOD - Notice of Determination
Received
Posted
4/10/2008
Present Land Use
Supports a County Communications Tower; zoned A70 (Limited Agriculture)
Document Description
The proposed unmanned wireless telecommunications facility consists of the placement of a multi-carrier 50-foot tall faux monopine and an associated equipment enclosure. The monopine will support three carriers, with 12 panel antennas per carrier. The equipment enclosure will house equipment for all three carriers as well as an emergency standby generator. The standby generator will be surrounded by a 9-foot high concrete masonry unit (CMU) block wall as a noise attenuation barrier. Additionally, all associated equipment, including the generator, will be completely surrounded by an 8-foot high CMU block wall solid metal doors. Additionally, a 2-foot high retaining wall will be placed adjacently to the east of the equipment enclosure to buttress the proposed 12-foot wide access easement. The project is located within the North Mountain Community Planning area, within the unincorporated portion of San Diego County.
Contact Information
Name
Merry Tondro
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency
Phone
Location
Counties
San Diego
Cross Streets
Peralta Drive, adjacent to Highway 79
Zip
92086
Total Acres
29.5
Parcel #
114-180-02-00
State Highways
79
Township
9S
Section
35
Base
SBB&M
Other Location Info
City/Community: Warner Springs
Other Information
Latitude/Longitude: 33° 21' 24.8" N; 116° 44' 24.9" W
Notice of Determination
Approving Agency
County of San Diego Planning Commission
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A