Santiago Creek Bike Trail - Tustin to Collins (Tustin Branch Trail)
3 Documents in Project
Summary
SCH Number
2008011017
Lead Agency
City of Orange
Document Title
Santiago Creek Bike Trail - Tustin to Collins (Tustin Branch Trail)
Document Type
NOD - Notice of Determination
Received
Posted
6/4/2008
Present Land Use
General Plan: MDR, LMR, Recreational Open Space, LDR
Zoning: R-3, RO, C-1, R-1-7, R-1-6
Document Description
The proposed project consists of the construction of a Class I bike trail along the Santiago Creek from Tustin Street to Walnut Avenue and city-owned railroad right-of-way from Walnut Avenue to Collins Avenue. The proposed project includes the expansion of the existing Santiago Creek Bike Trail by constructing a 10-foot wide paved bicycle trail approximately 7,750 linear feet with two foot graded/asphalt shoulders along Santiago Creek and 2,500 linear feet on city-owned railroad right-of-way which will join the existing Class I bike trail near Tustin Street/La Veta Avenue. A portion of the proposed bike trail is located on un-zoned railroad right-of-way; therefore the project also proposes zoning the un-zoned railroad right-of-way to R-O (Open Space). Since the proposed zoning will result in an inconsistency with the existing General Plan land use designation (Low medium density residential and Medium density residential), the project also proposes a General Plan Amendment to Open Space.
Contact Information
Name
Sharon Song
Agency Name
City of Orange
Contact Types
Lead/Public Agency
Phone
Location
Cities
Orange
Counties
Orange
Cross Streets
Tustin Street/Santiago Creek to Collins Avenue/Wanda Road
Zip
92866
Total Acres
3.3 linear
Parcel #
383-181-23; 383-161-37
State Highways
55 and 22
Schools
Handy Elementary School
Waterways
Santiago Creek
Notice of Determination
Approving Agency
City of Orange
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.