WCCUSD Charter Schools Construction & Modernization & City of Richmond MLK Community Center & Park

2 Documents in Project

Summary

SCH Number
2008011013
Lead Agency
West Contra Costa Unified School District
Document Title
WCCUSD Charter Schools Construction & Modernization & City of Richmond MLK Community Center & Park
Document Type
EIR - Draft EIR
Received
Present Land Use
Project Site A is currently developed with an existing school campus. Project Site B is currently developed with an existing school campus. Project Site C includes a large field, basketball courts, baseball fields, and a community center building at the north corner along Harbour Way South. The remainder of Project Site C is a narrow strip of parcels and associated dead-end streets located along the north side of Cutting Boulevard between Harbour Way South and Marina Way South. General Plan Designation: Project Site A: Public and Institutional; Medium Density Residential; Project Site B: Public and Institutional; Project Site C: Public and Institutional, Recreational Lands, Commercial (Neighborhood Retail), and Medium Density Residential. Zoning: Project Site A: Public and Civic Uses (PC); Multi-Family Residential (MFR-1); Project Site B: Public; Project Site C: Public/Park-Playground or Neighborhood Commercial.
Document Description
The primary purpose and objective of the Project Site A and Project Site B portion of the proposed project is to provide students with modern school facilities that would adequately accommodate student and faculty needs. The proposed project would fulfill the District's obligations to provide equivalent facilities to the RCP and LPS charter schools. At project completion at Project Site A, the existing facilities would have been demolished and new facilities would have been constructed. At project completion at Project Site B, the existing 1-story facilities would have been demolished, modernization of both wings of the existing Nystrom Elementary School building would have been completed, and a new temporary modular unit campus, new multi-use facility, and new play areas would have been constructed. Additionally, South 11th Street would transition to a pedestrian area and a new driveway would have been constructed between South Harbour Way and South 12th Street. The primary purpose and objective for the Project Site C portion of the proposed project is to address the existing maintenance needs at the MLK Community Center and Park such that the area is more usable and accessible to the wider community and to renovate the site design for the entire MLK Community Center and park to integrate it with the improvements for Nystrom Elementary School campus (Project Site B). At project completion at Project Site C, some of the existing facilities and outdoor recreation space would have been renovated.

Contact Information

Name
William Savidge
Agency Name
West Contra Costa Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Richmond
Counties
Contra Costa
Cross Streets
Site A-Bisell/Chanslor/8th/9th St; Site B-Florida/Harbour Way/12th St; Site C-Harbour/Cutting
Zip
94804,801
Total Acres
A3.5B8.9C15.5=30
Parcel #
Multiple Parcels
State Highways
I-580
Railways
Union Pacific Rail, Amtrak
Schools
Nystrom Elem, Gompers High School
Waterways
San Francisco Bay
Township
1N
Range
4W
Section
20
Base
MDB&M

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Bay Delta Region 3 (CDFW), California Department of Parks and Recreation, California Highway Patrol, California Native American Heritage Commission (NAHC), California Public Utilities Commission (CPUC), California Regional Water Quality Control Board, San Francisco Bay Region 2 (RWQCB), California State Lands Commission (SLC), Department of Toxic Substances Control, Department of Water Resources, Office of Historic Preservation, Resources Agency, San Francisco Bay Conservation and Development Commission (BCDC), California Department of Transportation, District 4 (DOT)
State Reviewing Agency Comments
California Department of Transportation, District 4 (DOT)
Development Types
Educational (School Construction and Modernization Project ), Recreational (Community Center and Park Renovation Project)
Local Actions
Site Plan
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Cumulative Effects, Drainage/Absorption, Flood Plain/Flooding, Geology/Soils, Hazards & Hazardous Materials, Hydrology/Water Quality, Land Use/Planning, Noise, Public Services, Recreation, Schools/Universities, Transportation, Vegetation

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print