Tentative Tract Map No. 33973
2 Documents in Project
Summary
SCH Number
2008011002
Lead Agency
City of Perris
Document Title
Tentative Tract Map No. 33973
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2008
Present Land Use
Vacant/Single Family R-6000/Residential (R-6000)
Document Description
The proposed project is a Tentative Tract Map of 384 single-family residential lots on approximately 153.7 acres (2.50 dwelling units/gross acre). Six lettered lots include 47.36 acres. Lots A, B, and C are San Jacinto River Corridor Open Space lots; Lot D (0.91 acre) is a proposed City-maintained Detention/Water Quality Basin; Lot E is a proposed 25.4-acre City-maintained community park, which includes a grinder pump system to handle sewerage generated from park; and Lot F is a 0.22 acre sewer lift station. Primary access to the project site is via River Road from Mapes Road west of Goetz Road to Ethanac Road. Secondary Access is from Mapes Road via Phillips Street to Ethanac Road.
Contact Information
Name
Joann Lombardo
Agency Name
City of Perris Planning Division
Contact Types
Lead/Public Agency
Phone
Location
Cities
Perris
Counties
Riverside
Cross Streets
North of San Jacinto River, West of McPherson Road, South of Ethanac Road, East of Sophie Street
Zip
92572
Total Acres
153.7
Parcel #
various
State Highways
215
Airports
Perris Airport
Schools
Numerous
Notice of Determination
Approving Agency
City of Perris
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
N/A
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.