Solar Electric System, Ironwood State Prison

Summary

SCH Number
2007128032
Lead Agency
General Services, Department of (Department of General Services)
Document Title
Solar Electric System, Ironwood State Prison
Document Type
NOE - Notice of Exemption
Received
Posted
12/4/2007

Document Description
The project consists of installing a solar photovoltaic system for renewable energy production at the State Prison facility. The project site encompasses about 12.2 acres and will consist of 6,208 solar photovoltaic modules. A ten foot tall chain link fence with barbed wire on top will be installed around the perimeter of the project area. There are no plans for site grading for this project as the site was a former jojoba field, has been previously disturbed, and is level ground.

Contact Information
Brian Wilkinson
Department of General Services
707 Third Street
West Sacramento, CA 95605

Phone : (916) 376-1603

Location

Cities
Blythe
Counties
Riverside

Notice of Exemption

Exempt Status
Categorical Exemption
Type, Section or Code
Section 15303, 15304
Reasons for Exemption
The project consists of minor construction activities associated with the installation of photovoltaic panels, electrical connections, and minor grading. The project site has been previously disturbed by grading and prison operations; the site has minimal habitat value. The project will substantially reduce the prison's use of electrical power from the regional grid.

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print