San Andreas Sanitary District Pond D Improvement Project (Streambed Alteration Agreement No. 1600-2018-0097-R2)

11 Documents in Project

Summary

SCH Number
2007122100
Lead Agency
San Andreas Sanitary District
Document Title
San Andreas Sanitary District Pond D Improvement Project (Streambed Alteration Agreement No. 1600-2018-0097-R2)
Document Type
NOD - Notice of Determination
Received
Posted
6/11/2018
Present Land Use
Public Service
Document Description
Project includes improvements to Pond D within the San Andreas Sanitary District's property to meet emergency storage requirements as well as anticipated influent flow. These improvements are described as the construction of a new drainage diversion ditch and storm drain outfall structure, which will include the installation of two parallel concrete pipes and headwalls, a concrete vault, a corrugated steel pipe down drain, a concrete headwall with energy dissipater and riprap. Construction work will also involve activities related to site preparation such as grading, trenching, erosion control and clean up. The construction of the concrete headwall with energy dissipater and riprap will impact the bank of San Andreas Creek. This project has an associated MND. The project location and drawings are in Exhibit A and B. Equipment used in the project includes excavator, bulldozer, roller, compactor or motor grader.

Contact Information

Name
Sarah Lose
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Counties
Calaveras
Cross Streets
Gold Strike Road and Gold Oak Road
Zip
95249
Total Acres
6
Parcel #
40012039
State Highways
Hwy 49, 12, 88
Schools
Calaveras HS
Waterways
Murray Creek
Township
4N
Range
11E
Section
13
Base
MDB&M
Other Location Info
City/Nearest Community: San Andreas

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print