China Slide Curve Improvement Project

3 Documents in Project

Summary

SCH Number
2007122099
Lead Agency
California Department of Transportation, District 2
Document Title
China Slide Curve Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
3/7/2008
Present Land Use
Public Lands/Unclassified/Resource adjacent State Route 299
Document Description
Safety project to increase the horizontal curve radius and increase the shoulder width 7 ft. to meet current highway design standards (adding 4 feet to include paved shoulders and 3 feet for shoulder backing and a roadside ditch). The road alignment will shift to the south into the embankments, slopes will be cut back and the material hauled to the disposal site and staging area, construct retaining walls, replace drainage features, and reseed construction disturbed surfaces. Disposal site - crush and store material, stage equipment.

Contact Information

Name
Debbie Pedersen
Agency Name
California Department of Transportation
Contact Types
Lead/Public Agency

Location

Counties
Trinity
Cross Streets
On State Route 299 from Post mile 13.3 to 13.8
Total Acres
6.1
State Highways
299
Waterways
Trinity River, Bidden Creek, Mill Creek
Township
5
Range
6
Section
ptn24
Other Location Info
City/Nearest Community: Burnt Ranch

Notice of Determination

Approving Agency
Caltrans
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print