Stream Alteration Agreement No. 2009-0155-R4 for the Old Wards Ferry Road Realignment Project

6 Documents in Project

Summary

SCH Number
2007122072
Lead Agency
City of Sonora
Document Title
Stream Alteration Agreement No. 2009-0155-R4 for the Old Wards Ferry Road Realignment Project
Document Type
NOD - Notice of Determination
Received
Posted
3/1/2010
Document Description
The construction of the new alignment for Old Ward's Ferry Road across an unnamed tributary to Sullivan Creek. A 135 ft long, 48 inch diameter pipe will be installed underneath the new road alignment to convey water. At the inlet, a new concrete headwall will be constructed. At the outlet a concrete headwall and rip-rap apron will be constructed. Clena fill dirt will be used to fill the channel above the pipe. The new road alignment will cross over the fill. Fill dirt will be placed in the channel just downstream of the culverts under Sanguinetti Road to stabilize the road edge. Riparian vegetation and tree removal is proposed. The Project area consists of the area within or adjacent to an unnamed tributary to Sullivan Creek, with associated foothill pine and blue-oak woodland, and riparian habitat.

Contact Information

Name
Annette Tenneboe
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sonora
Counties
Tuolumne
Cross Streets
Sanguinetti Rd. and Old Wards Ferry Rd.
Zip
95370
Total Acres
19.59
Parcel #
56-570-41
State Highways
108
Railways
Sierra
Schools
Sonora El.
Waterways
Sullivan Creek
Township
1N
Range
15E
Section
6
Base
MDBM

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print