Cross Connection Controls Project
6 Documents in Project
Summary
SCH Number
2007122024
Lead Agency
City and County of San Francisco
Document Title
Cross Connection Controls Project
Document Type
NOD - Notice of Determination
Received
Posted
6/2/2008
Present Land Use
Various
Document Description
The San Francisco Public Utilities Commission (SFPUC) proposes the Cross Connection Controls project to address California Department of Health Services concerns regarding potential contamination along the SFPUC's regional water system. Contamination may occur where air valves and blow-off valves, while being opened or closed, allow water from outside of the system (rainfall, flood water, etc.) to enter and compromise water quality. The proposed project would install protective devices to insure the integrity of certain identified value systems. There are 27 sites along the regional water system in Alameda, Santa Clara, and San Mateo counties where existing configurations for air/vacuum relief valves and blow-offs create potential cross-connections that must be corrected. The proposed project would include one or more of the following activities:
- Reconstruct or raise an existing vault with a new cover.
- Install a new vault cover with new air vents.
- Install new flap valves or blank flanges on an existing blow-off pipe.
- Replace an existing air vent within an existing vault.
- Modify, relocate or remove an existing blow-off.
- Abandon a vault and construct a new one.
- Exploratory excavation to determine needed construction.
Contact Information
Name
Jamie Dean
Agency Name
City and County of San Francisco Planning Department
Contact Types
Lead/Public Agency
Phone
Email
Location
Cities
Burlingame, Colma, Fremont, Hillsborough, Menlo Park, Menlo Park, Fremont, Milpitas, Redwood City, Colma, ..., Milpitas, Redwood City, San Mateo
Counties
Alameda, San Mateo, Santa Clara
Notice of Determination
Approving Agency
City and County of San Francisco
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A