San Juan Capistrano Ortega Highway Pipeline Project

2 Documents in Project

Summary

SCH Number
2007121123
Lead Agency
City of San Juan Capistrano
Document Title
San Juan Capistrano Ortega Highway Pipeline Project
Document Type
NOD - Notice of Determination
Received
Posted
7/7/2008
Document Description
The proposed project consists of the construction of approximately 5,287 linear feet of 12-inch diameter potable water main pipeline within the Ortega Highway right-of-way. The pipeline would be installed during the proposed widening of the Ortega Highway, currently under consideration by the California Department of Transportation (Caltrans). By installing the pipeline during Caltrans' construction period, the City would minimize direct impacts of the project and avoid the need to disrupt the street in the future. The project would increase the reliability and quality of service within the existing water distribution system to adequately serve existing users, and to meet increasing fire safety demands. The pipeline would be constructed within the paved roadway at depths ranging from approximately 4 to 5 feet below the existing surface. The project is anticipated to include trenching excavation, pipeline installation, backfilling, compacting, and soil replacement all within the construction zone of the Caltrans road widening project.

Contact Information

Name
Eric Bauman
Agency Name
City of San Juan Capistrano
Contact Types
Lead/Public Agency

Location

Cities
San Juan Capistrano
Counties
Orange
Cross Streets
Toyon Drive and Antonio Parkway
State Highways
74

Notice of Determination

Approving Agency
City Council of the City of San Juan Capistrano
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes