Vons Fuel Center Signage
2 Documents in Project
Summary
SCH Number
2007121116
Lead Agency
City of Bishop
Document Title
Vons Fuel Center Signage
Document Type
NOD - Notice of Determination
Received
Posted
3/6/2008
Present Land Use
C-2 zoning district/General Commercial
Document Description
This project is a request by Von- A Safeway Company to set aside Bishop Municipal Code Section 17.76.100 Signs-Commercial district at the Vons Fueling Facility, 1190 D North Main Street. There will be 104 sf of signage added to the shopping center existing Wye Rd. pylon sign and 141.5 sf of reconfigured signage on the shopping center existing Main Street pylon sign. On the Vons Fuel Center canopy and convenience store there will be 161 sf of new signage. The project is proposing a total of 406.5 sf of new signage exceeding the allowable 80 sf of signage by 326.5 feet. Von Store also proposes to reconfigure existing store signage without exceeding the Vons Store conditional use permit allowable sign square footage.
Contact Information
Name
Richard F. Pucci
Agency Name
City of Bishop
Contact Types
Lead/Public Agency
Phone
Location
Cities
Bishop
Counties
Inyo
Cross Streets
Maclver Street and Wye Road
Zip
93514
Total Acres
7.16
Parcel #
08-360-08
State Highways
395
Airports
yes
Schools
yes
Waterways
yes
Notice of Determination
Approving Agency
City of Bishop
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.