Lake Arrowhead Community Services District New Production Wells Project - Addendum No. 1

4 Documents in Project

Summary

SCH Number
2007121113
Lead Agency
Lake Arrowhead Community Services District
Document Title
Lake Arrowhead Community Services District New Production Wells Project - Addendum No. 1
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2009
Document Description
The project consisted of the drilling, installing, developing, test-pumping and producing water from several test wells within the District's service area. This document focuses on 2 of the test wells, Well No. 6 (Site A-1 in the adopted MND) and Well No. 8 (Site A-3), which have been selected for conversion to production wells based on the volume of water produced by these wells and the quality of the water. Well No. 6 was drilled to a deph of about 700 ft and produces ~40 gpm. Well No. 8 was drilled to a depth of about 500 ft and produces ~50 gpm. This Addendum serves as the basis for this second tier environmental review of Wells No. 6 and No. 8 of the original project, which consists of conversion of these 2 wells to production status. In summary, the changes being considered for the original project consist of: Convert existing test wells No 6 and No. 8 to production well and install the permanent pumps; Connect the wells to the existing distribution system by installing connecting pipelines, each line ~1,000 ft in length; Treat and deliver ~100 acre-ft per yr to the District's potable water distribution system; Modify the District's water purbeyor permit to incorporate the groundwater from Wells No. 6 and No. 8 as a new water supply source.

Contact Information

Name
Ryan Gross
Agency Name
Lake Arrowhead Community Services District
Contact Types
Lead/Public Agency

Location

Counties
San Bernardino
State Highways
173
Waterways
Lake Arrowhead
Township
2N
Range
3W
Section
many
Base
SBB&M
Other Location Info
City/Community: Lake Arrowhead

Notice of Determination

Approving Agency
Lake Arrowhead Community Services District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print