Panache Drainage District Funding, Construction, & Operation of SCADA System for Remote Tile Sump Operation

8 Documents in Project

Summary

SCH Number
2007121110
Lead Agency
San Luis and Delta Mendota Water Authority
Document Title
Panache Drainage District Funding, Construction, & Operation of SCADA System for Remote Tile Sump Operation
Document Type
NOD - Notice of Determination
Received
Posted
9/10/2020
Document Description
The Project is to implement one feature as described in the Long-Term Storm Water Management Plan 2020-2045 that is the subject of the Lead Agency's Addendum to 2009 Final EIS/EIR for the Grassland Bypass Project ("2009 Final EIS/EIR), that is, funding , constructing and operating a Supervisory Control & Data Access ("SCADA") System to allow remote shut off of tile sumps throughout the Grassland Drainage Area in order to control tile sump discharges to assist in managing storm-related flows. The construction involves two radio control towers, one 80' in height and one 40' in height, with bases of approximately 8' X 1 O' at a depth of 4' at highly disturbed agricultural locations. The Project also involves entering into access agreements and Landowner authorization for the District to operate tile sumps. Construction includes two standard mitigation measures for each construction site, a cultural study and report, and a pre-construction survey. The District will implement these and any other applicable requirements of the Mitigation Monitoring & Reporting Program adopted for the Long-Term Storm Water Management Plan 2020-2045.

Contact Information

Name
Ara Azhderian
Agency Name
Panoche Drainage District
Contact Types
Lead/Public Agency

Name
Agency Name
Panache Drainage District
Contact Types
Project Applicant

Location

Counties
Fresno, Mendocino, Stanislaus
Other Location Info
The Project is located on the western side of San Joaquin Valley, in the Grassland Drainage Area, and the main Project features are located primarily in the counties of Merced and Fresno. However, Project compliance monitoring also occurs in Stan·islaus County.

Notice of Determination

Approving Agency
Panache Drainage District
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
Yes
(5) A Statement of Overriding Considerations was adopted for this project
Yes
(6) Findings were made pursuant to the provisions of CEQA
Yes

Attachments

Disclaimer: The Governor’s Office of Planning and Research (OPR) accepts no responsibility for the content or accessibility of these documents. To obtain an attachment in a different format, please contact the lead agency at the contact information listed above. For more information, please visit OPR’s Accessibility Site.