Remedial Action Plan at East Los Angeles High School No. 2 (Area D)

2 Documents in Project

Summary

SCH Number
2007121106
Lead Agency
Department of Toxic Substances Control
Document Title
Remedial Action Plan at East Los Angeles High School No. 2 (Area D)
Document Type
NOD - Notice of Determination
Received
Posted
2/4/2008
Present Land Use
The Site formerly consisted of residential properties that were developed in 1928. The Site is currently unoccupied and all Site buildings have been demolished with DTSC concurrence and oversight as part of school pre-construction activities.
Document Description
The project is the implementation of a Remedial Action Plan (RAP) at the proposed East Los Angeles High School No. 2 (Area D). The proposed RAP project is a part of a new school construction project of the LA Unified School District. A proposed remedial action will be conducted in accordance with the RAP to address soils impacted with elevated levels of lead, arsenic, total petroleum hydrocarbon (TPH), polycyclic aromatic hydrocarbons (PAHs), dioxins, and furans.

Contact Information

Name
Sharon Fair
Agency Name
Department of Toxic Substances Control
Contact Types
Lead/Public Agency

Location

Cities
Los Angeles, Los Angeles, City of
Counties
Los Angeles
Cross Streets
East Cesar Chavez, Brannick Avenue, Hammel Street, and Eastern Avenue
Zip
90063
Total Acres
1.22
Parcel #
5234-002-034, 035, 036, 037, 040, 041, 042, 047
State Highways
I-10, I-710
Schools
East Los Angeles Star Adult Education
Waterways
Los Angeles River
Township
2S
Range
13W
Section
21
Base
SBB&M

Notice of Determination

Approving Agency
DTSC
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.