Kettleman City Surface Water Treatment Plant and Commercial Water Storage Tanks

7 Documents in Project

Summary

SCH Number
2007121098
Lead Agency
Kettleman, City of
Document Title
Kettleman City Surface Water Treatment Plant and Commercial Water Storage Tanks
Document Type
MND - Mitigated Negative Declaration
Received
Present Land Use
Vacant and highly disturbed land with existing dirt roadways transecting the project sites/Phase 1 zoning- Limited Agriculture Phase zoning- Highway Commercial
Document Description
The applicant is proposing to upgrade the community potable water system by installing a water treatment plant and commercial water storage tanks in two phases. Phase 1 consists of the construction of a water treatment plant that would treat water from the California Aqueduct. A new turnout will be constructed where the raw water supply would be pumped and cleaned with a membrane filtration and chloramine disinfection treatment process. The proposed capacity of the treatment facility is 900 gallons per minute (gpm) or 1.3 million gallons per day (MGD). No chemicals are required for the water treatment process except for small amounts of disinfectant, which will be injected into the water as it leaves the plant. Piping will be installed connecting the water treatment plant to the existing Community Service District water lines. Phase 2 consist of the construction of a Commercial Tank Facility which includes two 250,000 gallon welded steel water storage tanks, vertical centrifugal booster pumps, PVC pipelines, and electrical control building sitting on approximately 2 acres along with pipelines connecting to the existing Community Service District water lines.

Contact Information

Name
Ray Carlson
Agency Name
Kettleman City Community Service District
Contact Types
Lead/Public Agency

Location

Cities
Kettleman
Counties
Kings
Cross Streets
Phase 1-Fourth Street & General Petroleum Avenue Phase 2-Cyril Place & Hubert Way
Zip
93239
Total Acres
7
Parcel #
Ph. 1-042100101 Ph. 2-042150072
State Highways
41 and I-5
Schools
Kettleman City Elementary School
Waterways
California Aqueduct
Township
22
Range
19
Other Information
Section Cont'd: 19, Ph: 2-30

Notice of Completion

State Review Period Start
State Review Period End
State Reviewing Agencies
California Department of Fish and Wildlife, Central Region 4 (CDFW), California Department of Health Care Services (DHCS), California Department of Parks and Recreation, California Department of Transportation, District 6 (DOT), California Highway Patrol, California Regional Water Quality Control Board, Central Valley Fresno Region 5 (RWQCB), Department of Food and Agriculture (CDFA), Department of Water Resources, Office of Historic Preservation, Resources Agency, State Water Resources Control Board, Division of Water Rights, State Water Resources Control Board, Divison of Financial Assistance, California Native American Heritage Commission (NAHC)
State Reviewing Agency Comments
California Native American Heritage Commission (NAHC)
Development Types
Water Facilities (Type Treatment, MGD 1.3)
Local Actions
Water Treatment plant & Storage Tanks
Project Issues
Aesthetics, Air Quality, Biological Resources, Cultural Resources, Geology/Soils, Noise

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print