Banner/Nextel CA8405; P06-046, Log No. 06-10-003

2 Documents in Project

Summary

SCH Number
2007121091
Lead Agency
San Diego County
Document Title
Banner/Nextel CA8405; P06-046, Log No. 06-10-003
Document Type
NOD - Notice of Determination
Received
Posted
4/16/2008
Present Land Use
Zoning is S92 (General Rural). General Plan designation is (18) Multiple Rural. Current land use is undeveloped.
Document Description
The project is a Major Use Permit to construct an unmanned wireless telecommunications facility. The proposed Sprint Nextel Facility consists of a faux water tower, 45-feet in height, with antennas and an associated equipment shelter. The proposed faux water tank will carry 15 panel type antennas covering three sectors with five antennas per sector. The panel antennas would measure 6-feet in height and painted to match the color of faux water tank. The proposed equipment shelter measures 20-feet x 11.5 feet x 10-feet in height and would be adjacent to the base of the faux water tank.

Contact Information

Name
Kevin Johnston
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Counties
San Diego
Cross Streets
SR78 (844 Tavern Road)
Total Acres
350sf on a 68 ac
Parcel #
292-100-05
State Highways
78
Township
13S
Range
04E
Section
2
Base
SBB&M
Other Location Info
City/Community: Banner, Julian, Alpine

Notice of Determination

Approving Agency
County of San Diego
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print