Hilltop Master Plan
3 Documents in Project
Summary
SCH Number
2007112095
Lead Agency
City of Truckee
Document Title
Hilltop Master Plan
Document Type
NOD - Notice of Determination
Received
Posted
8/18/2008
Present Land Use
Commercial uses (restaurant, vehicle repair) single family home / Downtown Master Plan, Rural Residential-0.5 du/ac / Downtown Study Area, Residential
Document Description
NOTE: Recirculation of Revised Mitigated Negative Declaration.
(1) Master Plan to implement the Downtown Specific Plan with land use types, intensities, and densities; planned development to modify development standards and transfer density; streetscape standards; and infrastructure plan.
(2) Rezoning of properties from Downtown Master Plan to Downtown Mixed Use, Downtown High Density Residential, Downtown Medium Density Residential, Downtown Single Family Residential, and General Commercial.
(3) Downtown Specific amendments to redesignate a small portion of land from Master Plan to Commercial and Single Family Residential and minor text amendments, and modify general guidelines for development.
Contact Information
Name
Duane Hall
Agency Name
Town of Truckee Town Council
Contact Types
Lead/Public Agency
Phone
Location
Coordinates
Cities
Truckee
Counties
Nevada
Cross Streets
Brockway Road and Old Brockway Road
Zip
96161
Total Acres
57
Parcel #
19-140-08, 09, 14; 19-300-18, 19, 21, 36
State Highways
80, 267
Railways
Union Pacific
Waterways
Truckee River
Township
17N
Range
16E
Section
15
Base
MDB&M
Notice of Determination
Approving Agency
Town of Truckee Town Council
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.