Issuance of a Revised Solid Waste Facility Permit (SWFP) for the Global Materials Recovery Systems Facility, SWFP No. 49-AA-0390, Sonoma County
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007112069
- Lead Agency
- Sonoma County
- Document Title
- Issuance of a Revised Solid Waste Facility Permit (SWFP) for the Global Materials Recovery Systems Facility, SWFP No. 49-AA-0390, Sonoma County
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 6/9/2009
- Present Land Use
- Existing recycling facility in the M-1, Limited Urban Industrial and the LI Limited Industrial land use designation.
- Document Description
- The project is for an increase in commingled recyclables from 84 tons per day (tpd) to 124.5 tpd and acceptance and transfer up to 19 tpd of green waste. The project also includes an increase in the maximum permitted tpd from 484 tpd to 543.5 tpd and permit a mechanized sorting line in the Construction and Demolition building.
- Contact Information
-
John Loane
California Integrated Waste Management Board
Lead/Public Agency
1001 I Street P.O. Box 4025
Sacramento, CA 95812
Phone : (916) 341-6000
Location
- Cities
- Santa Rosa
- Counties
- Sonoma
- Cross Streets
- 3899 and 3911 Santa Rosa Avenue
- Zip
- 95404
- Total Acres
- 5
- Parcel #
- 134-181-044 & 134-181-048
- State Highways
- 101
- Railways
- Northwest Pacific/SMART
Notice of Determination
- Approving Agency
- California Integrated Waste Management Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- California Integrated Waste Management Board 1001 I Street P.O. Box 4025 Sacramento, CA 95812
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- N/A
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.