Ridgeview Office Complex (PMPA T20060559)
3 Documents in Project
Summary
SCH Number
2007112047
Lead Agency
Placer County
Document Title
Ridgeview Office Complex (PMPA T20060559)
Document Type
NOD - Notice of Determination
Received
Posted
5/29/2008
Present Land Use
Vacant, unimproved/Industrial Park, Combining Design Scenic Corridor/Industrial
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2008-0028-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sierra Crest Partners, LLC.
Filling of approximately 0.03 acres of an unnamed seasonal drainage with 198 cubic yards of native soils to allow for construction of an office complex. Stormwater and surface water runoff from the site that was previously drained by the seasonal drainage will be collected into a new underground stormwater culvert system and discharged into an existing ditch located in the southwest corner of the project site. Riparian vegetation does not appear to be associated with the seasonal drainage.
Contact Information
Name
Robert C. Hosea
Agency Name
California Department of Fish and Game
Contact Types
Lead/Public Agency
Phone
Location
Cities
Auburn
Counties
Placer
Cross Streets
Old Airport Road/Bell Road
Zip
95603
Total Acres
4.8
Parcel #
052-190-023
State Highways
I-80
Schools
Auburn Union School District
Township
13N
Range
8E
Section
27
Base
MDB&M
Notice of Determination
Approving Agency
California Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.