Murray Street Bridge Seismic Retrofit (Lake or Streambed Alteration Agreement No. 1600-2014-0313-R3)

3 Documents in Project

Summary

SCH Number
2007112037
Lead Agency
City of Santa Cruz
Document Title
Murray Street Bridge Seismic Retrofit (Lake or Streambed Alteration Agreement No. 1600-2014-0313-R3)
Document Type
NOD - Notice of Determination
Received
Posted
10/24/2016
Present Land Use
Coastal Dependent / Coastal Dependent Related
Document Description
CDFW has executed Lake and Streambed Alteration Agreement No. 1600-2014-0313-R3, pursuant to section 1602 of the Fish and Game Code to the Project Applicant, City of Santa Cruz Dept. of Public Works. Project is limited to the seismic retrofit of the Murray Street Bridge, widening of shoulders and replacement and improvement of sidewalks and barrier railings. Seismic retrofitting will be accomplished by installation of additional pilings and supplemental structural elements. Construction equipment that will be used at this site includes: crane, floating barge with water jetting system and hoists, trucks, portable storage barge, silt curtains and skiffs. Dewatering is not expected to be achievable at this location, and a "wet" pile installation is planned.

Contact Information

Name
Monica Oey
Agency Name
CDFW
Contact Types
Lead/Public Agency

Location

Cities
Santa Cruz
Counties
Santa Cruz
Cross Streets
Murray and Eaton
Zip
95062
State Highways
1
Railways
Union Pacific
Waterways
Santa Cruz Harbor, Monterey Bay

Notice of Determination

Approving Agency
CDFW
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print