West Sacramento Flood Control Agency Early Implementation Project

5 Documents in Project

Summary

SCH Number
2007112005
Lead Agency
West Sacramento Area Flood Control Agency
Document Title
West Sacramento Flood Control Agency Early Implementation Project
Document Type
NOD - Notice of Determination
Received
Posted
3/5/2008
Present Land Use
Sacramento River levee and Sacramento Bypass levee.
Document Description
The California Department of Fish and Game is executing Lake or Streambed Alteration Agreement number 1600-2007-0415-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, West Sacramento Area Flood Control Agency. To address under- and through seepage concerns at two sites along the Sacramento Bypass levee and Sacramento River in the City of West Sacramento, two treatments are being proposed. These treatments consist of seepage cutoff wall and relief well construction. Seepage cutoff wall construction is proposed at CHP Academy site and construction of seepage walls that may include relief wells is proposed at I Street Bridge site. The entire Sacramento Bypass Levee is a well-defined levee that has recently had improvements completed on portions of the levee. The improvements included an addition of soil cement slope protection along the Sacramento Bypass and construction of a seepage cutoff wall through the western portion of the levee. The proposed treatment area within the Sacramento Bypass Levee is roughly 3,000 feet in length, extending from the Sacramento Weir in a westerly direction toward the Yolo Bypass. The treatment proposed for the Sacramento Bypass levee consists of a seepage cutoff wall up to 80 feet deep through the waterside section of the crown. The treatment would overlap with the existing seepage cutoff wall and create a continuous seepage cutoff wall through the length of the Sacramento Bypass levee. Two staging areas used for storage of construction equipment and temporary storage of soil material excavated from the crown of the levee would be located within the bypass. A band of riparian vegetation is located within the bypass at the eastern end of the project.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
West Sacramento
Counties
Yolo
Cross Streets
South Old River Road, I street, 2nd Street
Zip
95619
State Highways
I-5, I-80, Hwy. 50
Railways
Union Pacific Railroad
Schools
Golden State Middle School
Waterways
Sacramento River, Sacramento Bypass

Notice of Determination

Approving Agency
DFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print