Jenkins TPM, TPM 21023, ER 06-03-004

2 Documents in Project

Summary

SCH Number
2007111082
Lead Agency
San Diego County
Document Title
Jenkins TPM, TPM 21023, ER 06-03-004
Document Type
NOD - Notice of Determination
Received
Posted
2/21/2008
Present Land Use
Agricultural (citrus) with one house. Zoning: A70 with 4 acre minimum lot size General Plan: Regional Category 1.3 Estate Development Area, Land Use Designation (18) Multiple Rural Use
Document Description
The project is a minor subdivision of 10.35 acres to create two residential parcels. The site is subject to the General Plan Regional Category 1.3 Estate Development Area, Land Use Designation (18) Multiple Rural Use. Zoning for the site is A70. The site contains an existing manufactured home with accessory structures to remain. Access would be provided by two separate driveways off of Quail Drive, a private road, connecting to Rincon Rancho Road, a publicly maintained road. The project would be served by on-site septic systems and imported water utilities will be required by the project, as the site is currently served with imported water by the Yuima Municipal Water District. Earthwork will consist of cut of 117 cubic yards and fill of 1,002 cubic yards, for a net import of 885 cubic yards of material. The project includes off-site improvements to two existing roads, Quail Drive and Rincon Rancho Road.

Contact Information

Name
Beth Ehsan
Agency Name
San Diego County Department of Planning and Land Use
Contact Types
Lead/Public Agency

Location

Cities
Pauma Valley
Counties
San Diego
Regions
Unincorporated
Cross Streets
18040 Quail Drive
Total Acres
10.35
Parcel #
132-220-18
State Highways
76
Schools
Pauma ES, Valley Center MS, Valley Center HS
Waterways
Yuima and Potrero Creeks
Section
0
Base
SBB&M
Other Location Info
Community: Pala Pauma Community Planning Area

Notice of Determination

Approving Agency
County of San Diego Director of Planning and Land Use
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
N/A

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print