30516 Coast Highway, St. Catherine of Siena Catholic School
2 Documents in Project
Summary
SCH Number
2007111037
Lead Agency
City of Laguna Beach
Document Title
30516 Coast Highway, St. Catherine of Siena Catholic School
Document Type
NOD - Notice of Determination
Received
Posted
1/14/2008
Present Land Use
Public/Institutional, Residential/Hillside Protection and Village High Density; R-1, Single-Family Residential; with the local street known as Cardinal Way
Document Description
Conditional Use Permit 06-28 and Coastal Development Permit 06-40 to demolish an existing 25,812 square foot private school and construct a new 39,754 square foot school, for an increase in floor area of 54%. Variance 7288 for sideyard setback, wall and fence height, and driveway grade is included. The 6.5 acre site will continue to take access from Coast Highway/Cardinal Way and egress from the St. Catherine's School Exit. Approximately 2.9 acres of the site will remain open space consisting of natural terrain and habitat. The project includes a fuel modification plan.
Contact Information
Name
Kathryn Lottes
Agency Name
City of Laguna Beach
Contact Types
Lead/Public Agency
Phone
Location
Cities
Laguna Beach
Counties
Orange
Cross Streets
Cardinal Way and Coast Highway
Zip
92651
Total Acres
6.5
Parcel #
656-191-02, 06
State Highways
1
Schools
Saint Catherine of Sienna Catholic School
Waterways
Aliso Creek
Notice of Determination
Approving Agency
City of Laguna Beach
Approving Agency Role
Lead Agency
Approved On
Determinations
(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.