Sheridan Wastewater Treatment Facility (WWTF) Project C/A 278, SCG-917

5 Documents in Project

Summary

SCH Number
2007102133
Lead Agency
Placer County
Document Title
Sheridan Wastewater Treatment Facility (WWTF) Project C/A 278, SCG-917
Document Type
NOD - Notice of Determination
Received
Posted
1/29/2009

Document Description
The WWTF is operated by the Placer County Special Districts-Sheridan. The WWTF currently consists of three stabilization ponds, including one aeration pond and two settling ponds. There is also a lined seasonal storage reservoir, a 1.6 acre sprayfield, and a 5.4 acre sprayfield. The Project involves expanding the capacity of the current facilities and will include upgrading the influent pump and magnetic flow meter at the Influent Pump Station, replacing the Effluent Pump Station, including 2 magnetic flow pumps, converting Pond 1 into a seasonal storage reservoir, and constructing two 90 gallons per minute floating irrigations pump stations, a pipeline from the seasonal storage reservoirs to the sprayfields, distribution piping, a permanent sprinkler system, and a new fence with recycled water irrigation signs.

Contact Information
Michelle L. Jones
State Water Resources Control Board
Division of Financial Assistance 1001 I Street, 16th Floor
Sacramento, CA 95814

Phone : (916) 341-6983

Location

Counties
Placer
Cross Streets
Ranch House Road
State Highways
SR 65
Other Location Info
Sheridan

Notice of Determination

Approving Agency
State Water Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
State Water Resources Control Board Division of Financial Assistance 1001 I Street, 16th Floor Sacramento, CA 95814

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(3) Mitigated measures were made a condition of the approval of the project
No
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search