CHP Academy and The Rivers Early Implementation Project

13 Documents in Project

Summary

SCH Number
2007102130
Lead Agency
West Sacramento Area Flood Control Agency
Document Title
CHP Academy and The Rivers Early Implementation Project
Document Type
NOD - Notice of Determination
Received

Document Description
To strengthen and/or raise approximately 5,820 linear-feet of project levee by constructing approximately 4,400 linear-feet of 25 to 70-foot-deep by 3-foot-wide slurry cutoff wall; flatten the landside and waterside levee slopes to 2.75:1 (H:V) and 3:1 (H:V), respectively, by shifting the levee prism 10 to 20 feet landward; and place concrete, rip-rap, or seeded slope protection on the left (south) bank levee of the Sacramento Bypass.

Contact Information
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave, Rm 151
Sacramento, CA 95821

916 574 0651

Location

Cities
West Sacramento
Counties
Yolo Solano
Cross Streets
various
Zip
95691
Parcel #
various
State Highways
I-80, US 50
Waterways
Sacramento River
Section
variou

Notice of Determination

Approving Agency
Central Valley Flood Protection Board
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
3310 El Camino Avenue, Rm 151 Sacramento, CA 95821

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
Yes
(5) Findings were made pursuant to the provisions of CEQA
Yes
Download CSV New Search