- Document Description
- To construct approximately 0.56 linear-miles of levee on the crest of River Crest Drive Levee along the south bank of the Sacramento River; installing a seepage cutoff wall ranging in depth from 90 to 135 feet deep; re-grade the landside slope to a 3:1; install six 4 inch diameter piezometers to a depth ranging from 23 feet to 54 feet; install 262 feet of maintenance road, paved ramps, parking, paved trails and bicycle pedestrian gates along the right (south) bank of the Sacramento River.
- Contact Information
-
James Herota
Central Valley Flood Protection Board
3310 El Camino Ave, Rm 151
Sacramento, CA 95821
Phone : (916) 574-0651
Location
- Cities
- West Sacramento
- Counties
- Yolo
- Cross Streets
- various
- Zip
- 95691
- Parcel #
- various
- State Highways
- I-80, US 50
- Waterways
- Sacramento River
- Section
- variou
Notice of Determination
- Approving Agency
- Central Valley Flood Protection Board
- Approving Agency Role
- Responsible Agency
- Approved On
- Final Environmental Document Available at
- 3310 El Camino Ave, Rm 151 Sacramento, CA 95821
Determinations
- (1) The project will have a significant impact on the environment
- Yes
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- No
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- Yes
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.