School of Engineering and Science & Greenhaven/Pocket Library Joint Use Project

3 Documents in Project

Summary

SCH Number
2007102124
Lead Agency
Sacramento City Unified School District
Document Title
School of Engineering and Science & Greenhaven/Pocket Library Joint Use Project
Document Type
NOD - Notice of Determination
Received
Posted
8/14/2008
Present Land Use
Vacant land and Sojourner Truth Park / R-1, Standard Single-Family Detached / Low Density Residential (4-15 dwelling units/net acre)
Document Description
The project would include a grade seven through twelve public school, a public library and a joint-use school/city park. The school would be designed with a capacity of 500 students, and would include five buildings ranging in height from one to two stories with a total of about 44,568 square feet. The public library would contain about 15,000 square feet and would be designed to achieve a LEED Silver certification. The joint-use park would provide a baseball/softball field and two youth (or one adult) soccer fields.

Contact Information

Name
James Dobson
Agency Name
Sacramento City Unified School District
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Swale River Way and Gloria Drive
Total Acres
13.55
Parcel #
031-0020-057-000, 058-000; 031-0440-028-000, 002-0000
State Highways
I-5
Airports
Sacramento Executive Airport
Waterways
Havenside Canal

Notice of Determination

Approving Agency
Sacramento City Unified School District
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
Yes
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print