Delta Emergency Rock and Transfer Facilities Project

3 Documents in Project

Summary

SCH Number
2007102118
Lead Agency
California Department of Water Resources (DWR)
Document Title
Delta Emergency Rock and Transfer Facilities Project
Document Type
NOD - Notice of Determination
Received
Posted
12/4/2007
Present Land Use
Port of Stockton site: Industrial / Public Lands / Institutional Use Hood: Industrial / Extensive Industrial / Industrial Rio Vista: Surface Mining / Agriculture / Agriculture
Document Description
The project proposes to stockpile riprap for emergency flood fighting operations at the three sites. The project would create a readily accessible state-owned inventory of riprap-size rock to be used in a large-scale disaster in which resources such as quarry production and truck hauling would be strained by excessive demands. The project also proposes to establish new transfer facilities at the Port of Stockton to load large rock from stockpiles and inland quarries onto barges for water-based emergency operations in the Delta. The proposed project would enhance readiness and improve operational flexibility to transport rock into the Delta during a flood emergency.

Contact Information

Name
David Rennie
Agency Name
Department of Water Resources, Division of Engineering
Contact Types
Lead/Public Agency

Location

Cities
Rio Vista, Stockton
Counties
Sacramento, San Joaquin, Solano
Cross Streets
Humphrey's and Snedeker Road/River Road (Hwy 160) and Hood Franklin Road/River Road (Hwy 84)
Zip
Multiple
Parcel #
Multiple
State Highways
12, 160, and 84
Airports
Rio Vista Municipal Airport
Waterways
Sacramento River and San Joaquin River
Other Location Info
City/Nearest Community: Hood

Notice of Determination

Approving Agency
CA Dept. of Water Resources
Approving Agency Role
Lead Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print