Center Parkway Bridge over Union House Creek Repair Project

3 Documents in Project

Summary

SCH Number
2007102088
Lead Agency
City of Sacramento
Document Title
Center Parkway Bridge over Union House Creek Repair Project
Document Type
NOD - Notice of Determination
Received
Posted
2/13/2009
Document Description
The CDFG is executing Lake or Streambed Alteration Agreement No. 1600-2008-0138-R2, pursuant to Section 1602 of the Fish and Game Code to the project applicant, Sacramento City, Development Services Department, Planning Division. The proposed project consist of a armoring the slopes beneath and adjacent to the existing bridge with rock slope protection (RSP), bridge deck repair, asphalt removal and repair. Slope armoring will occur along ~8 ft of each bank from abutment to the concrete lined channel directly beneath the existing bridge. Bridge deck repair will extend ~28 ft along the southbound side of the bridge. Asphalt removal and repair ~115 ft in length will occur at the interface between the bridge deck and the roadway on both the north and south approaches to the bridge.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
North of Cosumnes Boulevard and south of Union House Way
State Highways
80
Airports
Sacramento Executive
Waterways
Union House Creek
Other Location Info
City/Nearest Community: South Sacramento

Notice of Determination

Approving Agency
CDFG
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
N/A
(6) Findings were made pursuant to the provisions of CEQA
Yes

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.

Download CSV New Search Print