Church of the Latter Day Saints Wheatland Meetinghouse
3 Documents in Project
Download CSV
New Search
Print
Summary
- SCH Number
- 2007102073
- Lead Agency
- Wheatland, City of (City of Wheatland)
- Document Title
- Church of the Latter Day Saints Wheatland Meetinghouse
- Document Type
- NOD - Notice of Determination
- Received
- Posted
- 11/20/2008
- Present Land Use
- Vacant Land / Residential Estates (RE) / High Density Residential (HDR)
- Document Description
- The proposed project includes the construction of a church meetinghouse on a 5.04-acre site. The church meetinghouse would be an ~16,558 sf one-story structure, which is 28' in height and includes a 67' steeple. In addition, the project site would include the construction of a 168 sf storage building and a parking lot with 210 parking spaces. The project includes a rezone of the site to Residential (R-3) for consistency with the current General Plan land use designation of High Density Residential, a Use Permit to allow construction of a church in a residential zone, and an Architectural Review Permit.
- Contact Information
-
Tim Raney
City of Wheatland
313 Main Street
Wheatland, CA 95692
Phone : (530) 633-2761
Location
- Cities
- Wheatland
- Counties
- Yuba
- Cross Streets
- Wheatland Road/G Street
- Zip
- 95692
- Total Acres
- 5
- Parcel #
- 015-341-014
- State Highways
- 65
- Railways
- UPRR
- Schools
- Bear River MS, Wheatland UHS, Wheatland ES
- Waterways
- Grasshopper Slough, Dry Creek, Bear River
- Township
- 13N
- Range
- 5E
- Section
- 5
- Base
- MDB&M
Notice of Determination
- Approving Agency
- City of Wheatland
- Approving Agency Role
- Lead Agency
- Approved On
- Final Environmental Document Available at
- City of Wheatland 313 Main Street Wheatland, CA 95692
Determinations
- (1) The project will have a significant impact on the environment
- No
- (2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
- No
- (2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
- Yes
- (2c) An other document type was prepared for this project pursuant to the provisions of CEQA
- No
- (3) Mitigated measures were made a condition of the approval of the project
- Yes
- (4) A mitigation reporting or monitoring plan was adopted for this project
- N/A
- (5) A Statement of Overriding Considerations was adopted for this project
- No
- (6) Findings were made pursuant to the provisions of CEQA
- Yes
Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above. You may also contact the OPR via email at state.clearinghouse@opr.ca.gov or via phone at (916) 445-0613.