Sears Point Wetland and Watershed Restoration Project Final Environmental Impact Report

8 Documents in Project

Summary

SCH Number
2007102037
Lead Agency
Planning and Research, Office of (Office of Planning and Research)
Document Title
Sears Point Wetland and Watershed Restoration Project Final Environmental Impact Report
Document Type
NOD - Notice of Determination
Received

Document Description
The Project described in this Agreement is limited the breaching of the levee at the site known as Breach 2, which lies along Tolay Creek. The levee breaching is being undertaken in order to facilitate the larger Sears point Wetland and Watershed Restoration Project. Additional breaches are proposed, and up to four breaches will occur on the existing outboard levee to restore the area to full tidal marsh. Additional breaches beyond Breach 2 are not included as part of this Agreement because they either are not subject to Fish and Wildlife Code Section 1602 or are not proposed at this time. Breach 2 would be excavated during the initial restoration phase. Excavated materials from Breach 2 will be used to fill the adjacent drainage ditch or placed on the inboard side of the perimeter levee to create additional habitat. Breach 2 will be located near the southwestern corner of the Dickson Ranch complex and connect to Tolay Creek. Breach 2 will: require approximately 14,000 cubic yards (CY) of excavation; be approximately 285-foot-wide at the mean higher water (MHHW) elevation; have a 2 horizontal (H): 1 vertical (V) side slope; and a bottom elevation of -5 feet NAVD. The dimensions of Breach 2 would be identical to Breach 1.

Contact Information
Adam McKannay
California Department of Fish and Wildlife
Bay Delta Region 7329 Silverado Trail
Napa, CA 94558

707 944 5534

Location

Cities
Novato
Counties
Solano
Cross Streets
Hwy 37, 116, 121
Zip
94949
Total Acres
2,327
State Highways
37, 101
Railways
Northwestern Pacific
Waterways
Tolay Creek, San Pablo Bay

Notice of Determination

Approving Agency
Calfiornia Department of Fish and Wildlife
Approving Agency Role
Responsible Agency
Approved On
Final EIR Available Location
7329 Silverado Trail, Napa, CA 94558

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
Yes
(2b) A Negative Declaration was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A Statement of Overriding Considerations was adopted for this project
No
(5) Findings were made pursuant to the provisions of CEQA
Yes