Clairidge Way Storm Drain Improvement Project

2 Documents in Project

Summary

SCH Number
2007102021
Lead Agency
Sacramento County
Document Title
Clairidge Way Storm Drain Improvement Project
Document Type
NOD - Notice of Determination
Received
Posted
9/16/2008
Present Land Use
Low Density Residential / RD-3 and RD-5 / Low Density Residential
Document Description
The proposed project will install a new storm drainage system to provide improved storm water conveyance and alleviate flooding in the area. The project will install storm drain pipes and manholes along Robertson Avenue (from Norris Avenue to Becerra Avenue) and will upgrade an existing culvert on Clairidge Way. - The project will install 2,030 lineal feet of drainage pipe. - Upgrade the existing culvert in Clairidge Way. The existing 40-inch by 65-inch corrugated metal arch pipe culvert in Clairidge Way will be upsized to a 7-foot by 3-foot reinforced concrete box pipe. - Installation of a new 60-inch pipe outfall to Chicken Ranch Slough at 3741 Robertson Avenue, at the southeast corner of the property. The new outfall will consist of a new concrete headwall and riprap.

Contact Information

Name
Gary L. Hobgood
Agency Name
Department of Fish and Game
Contact Types
Lead/Public Agency

Location

Cities
Sacramento
Counties
Sacramento
Cross Streets
Robertson Avenue / Clairidge Way
Total Acres
2.8 +/-
Parcel #
255-0290-022
Schools
El Camino HS, Sacramento Lutheran HS
Waterways
Chicken Ranch Slough
Township
9N
Range
5E, 6E
Section
41
Base
MDB&M
Other Location Info
City/Nearest Community: Arden-Arcade

Notice of Determination

Approving Agency
Department of Fish and Game
Approving Agency Role
Responsible Agency
Approved On

Determinations

(1) The project will have a significant impact on the environment
No
(2a) An Environmental Impact Report was prepared for this project pursuant to the provisions of CEQA
No
(2b) A Mitigated or a Negative Declaration was prepared for this project pursuant to the provisions of CEQA
Yes
(2c) An other document type was prepared for this project pursuant to the provisions of CEQA
No
(3) Mitigated measures were made a condition of the approval of the project
Yes
(4) A mitigation reporting or monitoring plan was adopted for this project
N/A
(5) A Statement of Overriding Considerations was adopted for this project
No
(6) Findings were made pursuant to the provisions of CEQA
No

Disclaimer: The document was originally posted before CEQAnet had the capability to host attachments for the public. To obtain the original attachments for this document, please contact the lead agency at the contact information listed above.

Download CSV New Search Print